When my guyz took me to the KW Knitters fair they each choose a pattern.
Mr Bunnstible was my DH’s choice
I just love the construction of this Bunny
Waste yarn is knit in then removed and the stitches are picked up for the ears.

Ears done, picked up neck stitches and working body. Cool how this is knit in one piece picking up stitches.
Supper simple recommend this pattern to bunny makers.
This Months Kal for the Carry along forum on Rav:

The Christmas balls I use to stuff these are missing in action. I think the guyz were helping me again.
I put this on the list for the Kal, so I really should do it!
My Current Sock Project:
Foots first Socks 45% done started July/13
If you missed it “Basic Bra Making Part 1 & Part 2” are now up!
I have decided to reorder my wip list so the oldest ones are first and list my monthly Kal and my Sock Project separately, I always have these two on the go. So I think this will make more sense.
Current WIP List (9)
- Pine Forest Baby Blanket 50% done started Jan 11/12
- SPROUT – Growing Roots sweater 60% done started May 17/12
- Top Down Swing Pullover – 98% done started Jan 1/13
- Sea of Dreams Blanket 75% done started Mar 9/13
- Mile a minute afghan – crochet 50% done started Apr 24/13
- Isla lace Pillowcase edge 52% done started June 18/13
- Rose Harbour Shawl 75% done started Jun 28/13
- Fanflower Fling 50% done started Jul 12/13
- Mr Bunnstible started Sept 17/13
Ruffle ScarfDone started Dec 3/12 finished Jul 7/13Cozy Winter ShawlDone started Dec 1/12 – finished Jul 11/13Eileen DressDone started Jun 21/13 – finished Jul 11/13Easy Peasy Shawl– Done started Jul 14/12 – finished Jul 17/13All about love shawletteDone Started Aug 3/13 – finished August 17/13CalimetryStarted Sept 6/13 finished Sept 6/13
FO’s 2013 = 90
WIPS 2013 = 10 – 1 = 9
Used of 38 purchased patterns from Rav = 9 (29 to go)
Stash Used 2013 = 77
Sewing FO’s = 4
Books 2013 = 30 + 2 = 32
Thanks again for visiting,
cya Friday:0)
I’m off to visit Tami’s, then on to my blogwalk
come join me in the blogpond :0)
Find me on Ravelry.com and also my Etsy shop
Oh and FYI I have 50% off Back to School Sale at my Ravelry Shop, now we all have so much time with the kids in school. Sale lasts to the end of the month. 3 months till Christmas people!
Sep 25, 2013 @ 11:22:22
That bunny pattern is adorable. I love it. He is going to be adorable when finished.
Sep 26, 2013 @ 01:38:18
Love that bunny! Looks like a clever design.